Project Info
  • date 20180713
  • client Oxford
  • location Mery Street
Overeem were asked to take over a number of incomplete systems and systems that were not working as installed by a company that went bankrupt.

This is one of them. The system consists of an Orlanski wood gasification boiler, 2000L thermal storage serving floor heating and in-wall heating. Although the concept was good, it was very poorly installed and lacked proper system control. Overeem renewed all the pipework in the plant room, insulated it properly and introduced a proper system control that the client can monitor by virtue of 2 digital temperature displays. The difference in quality is evident, and the customer can now enjoy reliable, comfortable, warmth.